搜索资源列表
iec61850-4
- 变电站通信网络和系统 第思部分:系统和项目管理 (iec 61850-4:2004,IDT) -Substation communication networks and systems thinking: Systems and Project Management (iec 61850-4:2004, IDT)
iec61850-5
- 变电站通信网络和系统 第五部分:功能通信要求和装置模型 (iec 61850-5) -Substation communication networks and systems Part V: Communication requirements for functions and device model (iec 61850-5)
iec-61850-7.1
- 变电站通信网络和系统 第 7-1 部分:变电站和馈线设备的基本通 信结构 原理和模型-Communication networks and systems in substations Part 7-1: substation and feeder equipment structure principle and the basic model of communication
iec-61850-7.2
- 变电站通信网络和系统标准 变电站通信网络和系统第7-2 部分:变电站和线路(馈 线)设备的基本通信结构 抽象通信服务接口(ACSI)-Standards for substation communication networks and systems communication networks and systems in substations Part 7-2: Substation and line (feeder) Basic communication structure
iec-61850-7.3
- DL/T 860.73-2004(IEC 61850-7-3) 变电站通信网络和系统第7-3 部分:变电站和馈线设备的基本通信结构 公用数据类 -DL/T 860.73-2004 (IEC 61850-7-3) communication networks and systems in substations Part 7-3: substation and feeder equipment, basic communication structure for common data class
iec-61850-7.4
- DL/T 860.74(IEC 61850-7-4) 变电站通信网络和系统第 7-4 部分:变电站和馈线设备基本 通信结构 兼容逻辑节点类和数据类 -DL/T 860.74 (IEC 61850-7-4) communication networks and systems in substations Part 7-4: Basic communication substation and feeder equipment structure Compatible logical node
yalibisuo
- 用VB个人开发的完成版本的变电站内开关压力值的管理软件,能生成压力曲线,监视异常。-Personal development with the VB version of the substation to complete pressure switch management software, can generate pressure curve, monitoring exceptions.
substationyanshouguofan
- 国家电网最新发布的变电站智能化改造工程验收规范-National Grid Substation Intelligent latest renovation project acceptance
STS360peizhi
- 描述61850变电站配置最新标准要求,做变电站最好的资料。-Substation configuration descr iption of the latest standards 61850 and do the best information substation.
www2
- 学习智能变电站IEC61850配置SCD 参考-Learning Intelligent Substation IEC61850 configuration SCD Reference
PIC18F6520-Program
- This program is used in Profibus application. Uart2 is for Profibus substation, Uart1 is used for main station communication with substation.
Cabinet-Specifications-
- 智能变电站的技术规范,对这个行业的人很有帮助-Intelligent Substation technical specifications of the industry were very helpful! !
SE_ION_7650-Onb1-Exp1-F01_E1V01
- Ex_1: Substation Configuration Descr iption Language (SCL) is the language and representation format specified by IEC 61850 for the configuration of electrical Substation
SE_ION_7650-Onb1-Exp2-F01_E1V01
- Ex_2: Substation Configuration Descr iption Language (SCL) is the language and representation format specified by IEC 61850 for the configuration of electrical Substation
SE_ION_7650-Onb1-Exp3-F01_E1V01
- Ex_3: Substation Configuration Descr iption Language (SCL) is the language and representation format specified by IEC 61850 for the configuration of electrical Substation
SE_ION_7650-Onb1-Exp4-F01_E1V01
- Ex_4: Substation Configuration Descr iption Language (SCL) is the language and representation format specified by IEC 61850 for the configuration of electrical Substation
SE_ION_7650-Onb1-Exp5-F01_E1V01
- Ex_5: Substation Configuration Descr iption Language (SCL) is the language and representation format specified by IEC 61850 for the configuration of electrical Substation
project1
- 变电所的串口通信,协议为MODBUS协议-Substation serial communication protocol for the MODBUS protocol
220kV
- 220kV数字化变电站测控保护一体化的实现方式-220kV substation digital protection and control integration implementation
Cyber-Security-and-Power-System
- 在智能电网方面的论文 智能电网的网络安全方面的 希望对大家有帮助-The introduction of “smart grid” solutions imposes that cyber security and power system communication systems must be dealt with extensively. These parts together are essential for proper electricity transmissio