搜索资源列表
BBO
- 用生物地理学算法做的一个解决热点联产电厂负荷优化分配的完全算例。-Do biogeography algorithm, the optimal load distribution of a solution to the cogeneration power plant complete example.
cascade
- 热电厂简单串级控制系统,包括两个PID控制器-Cogeneration simple cascade control system, including two PID controller
track
- 一个PID串级控制系统,可以实现手自动的无扰切换-Cogeneration simple cascade control system, including two PID controller
CGAM_model
- CGAM热电联产系统的优化模型,结合热经济学和火用分析,2个目标函数,5个决策变量-Optimization Model CGAM cogeneration systems, combined heat economics and exergy analysis, two objective functions, five decision variables.
