文件名称:jobscheduling
-
所属分类:
- 标签属性:
- 上传时间:2014-10-22
-
文件大小:6.21kb
-
已下载:0次
-
提 供 者:
-
相关连接:无下载说明:别用迅雷下载,失败请重下,重下不扣分!
介绍说明--下载内容来自于网络,使用问题请自行百度
用两台处理机A和B处理n个作业。设第i个作业交给机器A处理时所需要的时间是a[i],若由机器B来处理,则所需要的时间是b[i]。现在要求每个作业只能由一台机器处理,每台机器都不能同时处理两个作业。设计一个动态规划算法,使得这两台机器处理完这n个作业的时间最短(从任何一台机器开工到最后一台机器停工的总的时间)。-Processing n jobs with two processors A and B. Time the i-th processing operations required to machine A is a [i], if processed by the machine B, the time required is b [i]. Now requires that each job can only be processed by a machine, each machine can handle both jobs. Design a dynamic programming algorithm, making these two machines finish the job processing time of these n shortest ( any machine starts to total time last machine downtime).
(系统自动生成,下载前可以参看下载内容)
下载文件列表
JobScheduling.dsp
JobScheduling.dsw
JobScheduling.ncb
JobScheduling.opt
JobScheduling.plg
JobScheduling.cpp
JobScheduling.dsw
JobScheduling.ncb
JobScheduling.opt
JobScheduling.plg
JobScheduling.cpp
1999-2046 搜珍网 All Rights Reserved.
本站作为网络服务提供者,仅为网络服务对象提供信息存储空间,仅对用户上载内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。
