文件名称:GA_Flow-Shop
介绍说明--下载内容来自于网络,使用问题请自行百度
流水线型车间作业调度问题可以描述如下:n个任务在流水线上进行m个阶段的加工,每一阶段至少有一台机器且至少有一个阶段存在多台机器,并且同一阶段上各机器的处理性能相同,在每一阶段各任务均要完成一道工序,各任务的每道工序可以在相应阶段上的任意一台机器上加工-Pipelined job shop scheduling problem can be described as follows: n tasks for the m-th stage processing on the assembly line, there is at each stage of the at least one machine with at least the presence of many machines a stage, and the same processing performance of each machine on the same stage , at each stage any machine each task required to complete a process, each process of each task can be processed in the respective stages
(系统自动生成,下载前可以参看下载内容)
下载文件列表
GA.txt
1999-2046 搜珍网 All Rights Reserved.
本站作为网络服务提供者,仅为网络服务对象提供信息存储空间,仅对用户上载内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。
